Holiday villas in complex “Aheloy Beach Resort”, Aheloy, Bulgaria

123,988€
Listing ID: ALFA-24682
Living Area: 120.41-195.1 m²
Built in: 2015
11/09/2013

Holiday villas in complex Aheloy Beach Resort, located on the waterfront in Aheloy.

In a quiet, sunny location on the beach, will be build a new complex of twenty houses that will offer everything needed for a comfortable stay. The houses will be designed in a Mediterranean style. The advantage of the first line is stunning sea views and privacy. The settlement will offer a well-developed infrastructure: parking, pool, playground, pool bar and barbecue – ” barbecue “, beautifully decorated flower beds.

Distance to:

  • the sea – the first line ;
  • Bus stop – 500 m ;
  • Airport – 15 km
  • Burgas – 20 km

Infrastructure development :

  • Pool bar
  • Swimming pool with children’s section
  • playground
  • security
  • Cable TV / Internet / phone
  • reception

Houses:

Two storey. Total area of 118-199 square meters

Plot:

 172 to 360 sq.m.

Features:

Each house will be in a different place, with an area of 172-360 square meters. There are provided parking spaces on each terrace will flowerbeds. At the request of customers, we offer a possibility of an additional fee to install an outdoor Jacuzzi next to the house. A very important advantage is, that you do not need to register a legal entity for the purchase of land .

The quality of construction will be in compliance with all European standards. Building construction – brick , concrete , interior and exterior walls – brick. Waterproofing of the base houses and roofs of the outer shell . The windows are double glazed windows – PVC. Roof – tiles. Balconies – wrought iron with beautiful decorations. The village has a central water and sewer.

  • Decoration, “turnkey”
  • Floor: laminate and tile – color
  • Walls painted – color at your choise
  • Bathrooms : tile , water heater, sink, toilet and accessories
  • Doors: Interior – MDF, entrance – armored

Period of construction:

  • Start: October 2013
  • Rough construction (Act 14) – October 2014
  • Completion of construction (Act 15 ): June 2015
Share on Facebook0Tweet about this on TwitterShare on Google+0Share on LinkedIn0Share on Tumblr0Email this to someone
Share on Facebook0Tweet about this on TwitterShare on Google+0Share on LinkedIn0Share on Tumblr0Email this to someone
All rights reserved © 2026 - AlfaCity Europe